
Process
Five steps, in order
From the first conversation to the last seam, the same sequence every time. Nothing is cut before you have approved the layout on your slab.
12K slab scanner, Sterling
Digital material intake
Every slab catalogued on arrival
Process
Five steps, in order.
The same sequence for a single vanity or a full residence. Nothing is cut before you have approved the layout on your slab.
- 01
Consultation and design
We help you select the right material, finish and layout for your space, in the showroom or on site.
- 02
Digital templating
Laser templating captures exact measurements, so the slab is cut to the real room, not the drawing.
- 03
12K slab scanning
Every slab is scanned at 12K resolution for precise 3D layouts and digital vein matching. You approve the layout on your actual stone.
- 04
CNC fabrication
Digital files go straight to the machines. Accurate cuts, clean details, consistent quality, no manual translation.
- 05
Finishing and installation
Hand-finished, polished, dry-fit in the shop and inspected before our own team installs it.
Why professionals choose us
Technology driven, craftsmanship focused.

01
Digital material intake
Every slab scanned at 12K and catalogued, available for real-time 3D layout and remote review.

02
Precision field templating
Laser and digital templating of the space, so measurements reflect real-world conditions.

03
3D layout and design control
Vein flow, seams and focal points decided on the scanned slab, with visual approval before production.

04
Automated CNC fabrication
Digital files go straight to the machines. No manual translation, consistent results.

05
Quality control and pre-assembly
In-shop dry fit of every component. Seams, alignment and finish verified before the jobsite.

06
White-glove installation
Our own installers, coordinated with your project team. Clean, careful and detail-driven.
Timing and logistics
Process questions, answered
Typically one to two weeks from template to installation for material we have in stock. After templating, we lay out your countertop on a 12K scan of your slab, you approve it, it runs through CNC fabrication and hand finishing, and we dry-fit it in the shop. Installation itself is usually a single day. Special-order material adds the distributor's lead time.
Cabinets must be installed and level, and the sink and appliances should be on site so we can measure exact cut-outs. At the appointment we confirm overhangs, sink and cooktop cut-outs, edge profile and seam locations. The before-template-day checklist
Our own team. Templating, fabrication and installation are handled by Prime Stone Design, not subcontracted. On installation day we remove and dispose of the old countertops. Plumbing and gas reconnection is done by your plumber or contractor, and we are happy to recommend one.
You can use your new countertops 12 to 24 hours after installation. That short wait lets the seam adhesive and the silicone around sinks and cooktops cure. Natural stone is sealed with a penetrating sealer on installation day, and everyday use is fine once the adhesive has set.
